Offload & Commissioning of 1 ZPMC ship to shore container crane at the Evergreen Terminal in the Port of Tacoma, Washington
Provide labor, equipment and direct supervision to remove all voyage bracing and lashing.
Assist with the discharge from the vessel and landing on the dock.
Commence final commissioning and acceptance testing of the crane.